Engineering, quality, manufacturing and marketing each have their own system, their own cadence, and their own definition of what "done" means. In organizations at this stage, that isn't a failure — each function optimized for its own work, and each one succeeded.
The cost shows up at the boundaries: a deliverable arrives, the receiving function reconstructs the reasoning behind it, and reconstruction is where interpretation enters. Your PLM holds the product and your MES holds the floor, but the decisions and trade-offs that carry a design from one to the other sit in email, spreadsheets and meetings.
As a result, what one function knows takes weeks to reach the function that needs it. A constraint understood in March lands in June, when the design is already frozen. Moreover, what no single function owns may not happen at all: the idea from the cross-team workshop that never became tracked work, the field issue that never made it back to design, etc.
This isn't a communication problem. The work between them is real, but it doesn't appear in anyone's scope.
The first move here isn't replacing your PLM or your MES — it's giving the work between functions a space of its own. When a handoff lives somewhere both sides can see, the receiving team inherits the context instead of rebuilding it.
These results were calculated using a multifactorial model that took into account the average project duration and then weighted the responses based on each profile.